您現(xiàn)在的位置: 全球化工設(shè)備網(wǎng) >> 山東來遠(yuǎn)機(jī)械有限公司 >> 產(chǎn)品展示
產(chǎn)品類別
聯(lián)系方式
聯(lián)系人: 吳磊(先生)
電  話: 15562382979
傳  真: 8661706
手  機(jī): 15562382979
網(wǎng)  址:

產(chǎn)地:山東省濟(jì)寧市任城區(qū)

規(guī)格:鏟車改裝打樁機(jī)

公司所在地:山東濟(jì)寧

電話:15562382979

120060257  
詳細(xì)信息

電線桿打樁機(jī)長螺旋打樁機(jī)的簡單介紹

太陽能打樁機(jī)停止工作后,應(yīng)立即堵截電源,并對太陽能打樁機(jī)和電動(dòng)機(jī)進(jìn)行檢查、保養(yǎng)。

電線桿打樁機(jī)長螺旋打樁機(jī)的詳細(xì)信息

太陽能打樁機(jī)日常要注意的9點(diǎn)
9 points for daily attention of solar piling machine

太陽能打樁機(jī)日常要注意的9點(diǎn)
9 points for daily attention of solar piling machine
1、卷揚(yáng)機(jī)要每隔一天加注一次黃油。
1, the hoist should add a butter every other day.
2、太陽能打樁機(jī)鏟頭和夯錘中要參加適量填充物(如:沙土、鐵粉、石子)以使其能到達(dá)滿足分量。
2, solar power piling machine head and tamping hammer to participate in the right amount of filler (such as: sand, iron powder, stone) so that it can reach the component of satisfaction.
3、要常常查看鋼絲繩,若鋼絲繩有破口應(yīng)及時(shí)更換新的鋼絲繩。
3, we should always check the wire rope. If the wire rope has a break, we should replace the new wire rope in time.
4、每天查看三角架頂部支撐槽輪的螺絲,若螺絲呈現(xiàn)松動(dòng)現(xiàn)象要及時(shí)擰緊螺絲,避免發(fā)作毛病。
4. Check the screws on the top of the tripod top support every day. If the screw is loose, tighten the screws in time to avoid any attack.
5、太陽能打樁機(jī)停止工作后,應(yīng)立即切斷電源,并對太陽能打樁機(jī)和電動(dòng)機(jī)進(jìn)行查看、保養(yǎng)。
5, after the solar piling machine is stopped, the power supply should be cut off immediately, and the solar piling machine and motor should be checked and maintained.
6、太陽能打樁機(jī)長時(shí)間停用,應(yīng)入庫保管,電動(dòng)機(jī)要做好防潮維護(hù),操控盤上的外表,應(yīng)拆下裝箱保管。
6, solar piling machine for a long time to stop, should be stored in storage, motor to do moistureproof maintenance, control the appearance of the disk, should be removed and kept.
7、常常查看軸承溫度及軸承蓋螺釘是否有松動(dòng)現(xiàn)象,要嚴(yán)厲查看偏疼鐵塊聯(lián)結(jié)螺釘有無松動(dòng),避免發(fā)作事端。
7, often check the bearing temperature and bearing cap screws loose phenomenon, we must strictly check whether the loosening iron connecting screws loose, avoid seizures.
8、太陽能打樁機(jī)下沉?xí)r,管柱(或樁)周圍嚴(yán)禁站人。
8. When the solar piling machine sinks, people must not be standing around the column (or pile).
9、太陽能打樁機(jī)合作射水、吸泥下沉?xí)r,應(yīng)與有關(guān)人員預(yù)先聯(lián)系,并在工作中互相關(guān)照。
9, when solar piling machines cooperate to shoot water and sink mud, they should contact the relevant personnel in advance and take care of each other in their work.

以上是電線桿打樁機(jī)長螺旋打樁機(jī)的詳細(xì)信息,如果您對電線桿打樁機(jī)長螺旋打樁機(jī)的價(jià)格、廠家、型號(hào)、圖片有任何疑問,請聯(lián)系我們獲取電線桿打樁機(jī)長螺旋打樁機(jī)的最新信息

我要詢價(jià)

山東來遠(yuǎn)機(jī)械有限公司

聯(lián)系人:吳磊   聯(lián)系電話:15562382979   傳真:8661706  

技術(shù)支持:全球化工設(shè)備網(wǎng)    管理員入口